Design, engineering and construction supervision of Electric, HVAC, Plumbing, Fire protection, BMS, Telecommunications and IP Based light current systems for buildings.
2000 MVA 500/220 kv substation Project cost 375 million LE 500 kV air insulated switchgear yard 11 BAY 500 KV 10 Single Phase auto transformers The first 500 kv S/S in Egypt using the live line washing system (LLWS)
Scope of work
SHAKER Scope includes complete detailed engineering of but not limited to HV yard, protection, substation control building and all related structural and architectural works
SHAKER scope includes also complete construction management of the project
Status
First Phase finished in 2005 Second Phase under construction